Please wait...

Frequently Asked Questions

  1. Do I need to have a vSoft Studio account to use Project Studio?
    You do NOT need to sign in to a vSoft Studio account to use the app. However, certain features such as task synchronization and collaboration will not be available until you have signed in.
  2. When I click the checkbox on the task list, that task is not marked as completed?
    If your task is in a project with custom Task Stages, clicking on the checkbox allows you to change the current stage of the task instead of immediately marking the task as completed. In this case, you can click Done to complete the task.
  3. What are the Task Stages in a project?
    The task stages define the sequence of stages each task in that project will have. You can setup intermediate stages (e.g. “In Development”, “Testing”) between “To do” and “Done”, and each task will have the same stage sequence. At the moment, Project Studio does not support intermediate stages for tasks in no projects.
  4. What is Group for?
    Groups in Project Studio serve 2 main purposes: to categorize your tasks and to have finer access control.
    – By organizing your tasks into groups, you can quickly apply a filter to track the progress of only tasks in particular groups.
    – Groups also allow you to have finer access control on your project. For example, project managers would have write permission at project level while testers have read permission at project level and write permission on the Testing group. With this setup, project managers are able to create and modify all tasks in the project and testers can create and modify only tasks in Testing group; testers can also see tasks details in other groups but are unable to make any change. Take another example, you might also setup read permission on Release group for outside stakeholders while giving them no project level permission. This allows stakeholders to see the progress on only Release group while unable to make any change.
  5. How can I import/export/print my tasks?
    We are still working on the print function directly in Project Studio.
    At the moment, you can import or export tasks in a project into an Excel file and print the file. The “Import from Excel” and “Export to Excel” buttons are in the top right corner of the project details page. You can see a more detailed guide at https://projectstudio.online/how-to-import-export-tasks.
  6. Are there any versions of Project Studio outside of Windows 10?
    We are working on Project Studio on the web browser and other mobile platforms. We will share more details as we make more progress on those new platforms.
  7. What are the limitation of Basic account?
    Basic accounts still enjoy the full sync capability of Project Studio. However, there are 2 main limitations
    – The maximum number of project you can have is 5. If you have more than 5, some projects will not be synced and you will receive a notification.
    – For each project, there can only be at most 2 free members with write permission. If you have a Basic account and has the write permission in a project, you are counted as a free member against the limitation of 2 free members in that project.
  8. What happens when my Premium license expired?
    If you exceed any limit of the Basic license, sync engine will stop synchronizing your projects and an error message will show up in the Notification dialog of Project Studio and Action Center of Windows.

For any other questions or suggestions, feel free to send us an email at [email protected] or leave a comment below. If you like Project Studio, don’t forget to leave us a 5 stars rating in Windows Store!

Leave a Comment

Leave a Reply to vsoftstudio Cancel reply

Your email is safe with us.
*
*

Mark McCroskey

I there a print function ?

Reply

vsoftstudio

We are still working on the print function directly in Project Studio. At the moment, you can export tasks in the project into an Excel file and print the file.

Reply

aditya

I still don;t understand how to do the export to excel or import form excel.

Reply

aditya

Nevermind…. I read the other posts too and got how to do it.. Thanks

Reply

Sam Attard

Can I attach attachment from my computer instead from dropbox or onedrive. if yes How?

Thank you
Sam

Reply

vsoftstudio

At the moment you can upload local files to OneDrive or Dropbox directly in Project Studio.

Reply

Emma

When I have tried to add a second member to my project, I have received an error message saying that the project already has two members and the new member therefore can only have read only rights. However, this happens when the project only has one existing member. Please advise.

Reply

vsoftstudio

Please send us a screenshot of the Details tab of the project to [email protected].

Reply

scott

i see where i can export tasks. can i export/print the timeline?

Reply

vsoftstudio

Hi Scott, currently unfortunately we don’t have export for the timeline but we will implement it in future

Reply

Doug williams

That is the real reason I wanted this program though basic! It’s fundamental. I am not using this in a professional organization but an offering some consultative effort to my church. To keep them on task, they need to see where we are going.

Reply

Evelyn Figueroa

Hi,
I would like to know if all tasks are going to appear on my Outlook Calendar if I use my Office 365 account?.

Reply

vsoftstudio

We are very sorry that we do not have integration to calendar at the moment.

Reply

Cliff Jackson

Will you in future< how long?

Reply

Simon

I need to get another tem member on the list but I can’t seem to see where you can make that happen…. can you point me in the right direction?

Reply

vsoftstudio

You can add new team member in the Project details page.

Reply

Becca Bay

First of all- I love this application, and will be using it for project management until the foreseeable future.

Since printing is not currently available (I hope it will be soon), you mentioned exporting tasks. How do I export these? I have not been able to find a way to do it.

Reply

vsoftstudio

In the project details page, you will be able to find Export button in the top right corner.

Reply

Jens

Where are the projects stored physically on my computer? I’d like to include it in backups.
And what about the idea to choose my own server for synchronization?
Thank you

Reply

vsoftstudio

The project data is cached in local store of the Windows app in %localappdata%\Packages. However, we do not suggest to manually backup/restore the data because you might not set up all the file permissions correctly.
Due to the complexity of the online server, it is not possible to choose your own server for synchronization.

Reply

Francois Perea

Why can’t we allow a same groupe to différents projects ? It will be utile

Reply

Jose María Alfin

Is it possible to export the projects and task to an Excel sheet?

Reply

vsoftstudio

Hi Jose, to export your tasks to Excel, please follow these steps
1. Open your project, go to the Details tab
2. On the top right corner, click the … button
3. Click Export to Excel

Reply

Brock Anthony Jones

Is there any way I can copy and paste my tasks? They will be the same for every project and I’d like to create some sort of “default” project with reoccurring tasks so I don’t have to over the same thing over and over.

Reply

vsoftstudio

Hi Brock,

Would you mind explaining more on this use case?
Currently, if you click on the More (…) button in the top right of task details page, we have already implemented Clone function. Would that work for your scenario?

Reply

vsoftstudio

In future release, we will implement Project Template function. This will allow you to define a set of tasks that will be applied to new projects created from the template. Stay tuned with us!

Reply

Gourdon Tomes

This would be an extremely useful function. As would the feature to associate tasks to Projects – viz. can associate tasks to groups, but cant associate tasks (even cloned tasks) to a project – extremely annoying we have to retype every time we create a project – projects have sets of similar tasks (PM101 in PMBOK and or AgilePM).

Additional when will KanBan functionality be available?

Reply

vSoft Studio

Hi Gourdon, for the time being, you can export the project into Excel file and can use the file as a template by importing to new project.

Reply

Joe oh

Hi,I ‘d like to ask a basic question,i have several tasks which i have to execute everyday,i want it to remind me everyday, every single reminder for every single task.i don,t want to repeat the work everyday ,what should i do ?

Reply

Iain Montgomery

Hi there,
how do you rearrange tasks in the timeline or list view? I can’t see any way to do it and it’s a basic function of any project management system I’ve used. Really pleased with the software otherwise!
thanks

Reply

vsoftstudio

We are still working on custom task order in an upcoming update! Stay tune.

Reply

Nicola Noetic

I just want to make drawings with the scroll pen. Can’t find that on this program. Is this possible? So sick of going through so much hell just to make a simple free handed drawing. Why do you make something so simple so darned hard?!

Reply

vSoft Studio

Hi Nicola, as we are planning to add handwriting support to the app, we appreciate if you would drop us an email at [email protected] to describe your use cases. With those information, we would design the feature to work better for you.

Reply

Aubrey Gray

I have a simple question. Is there any way to change the color of my circle that has my initials in it? We are sorting by assignee and two of us have the same color. I was wanting to change mine and wasn’t sure if that was an option vs. trying to upload a picture.

Reply

vsoftstudio

You can edit your profile and upload a profile picture. 🙂

Reply

Fernando

Can we define sub-tasks?

Reply

vsoftstudio

Hi Fernando. Currently each task has a checklist, which is a mini subtask at the moment. We will implement the full subtask feature in near future

Reply

Mr.Ding

When will this be implemented?

Reply

JeromeBz

Hey

Is it possible to personalize the days off in the timeline ?

Thanks !

Jérôme

Reply

vsoftstudio

Hi Jerome, currently we don’t have the calendar function yet in Project Studio. It’s in our backlog and we will consider this feature in some future release

Reply

Jen Martinez

There aren’t any dates shown. Is this a function yet, as of 6/26/18?

Reply

Steve McBride

How do you implement predecessor and successor tasks?

Reply

vSoft Studio

This feature is not available at the moment. We are still working on adding task dependency in future updates.

Reply

John Hudgell

This would be a cery valuable feature and start to make it real PM tool rather than a individual task management tool.

Reply

amanda bernier

when will this functionality be available? this is the only thing preventing me from being able to use this for real.

Reply

S

same boat. That would help a ton .

Reply

S d

same boat. That would help a ton .

Reply

Yves Delsart

Hello
Is it possible to integrate project studio into Sharepoint ?

Reply

vsoftstudio

We would appreciate if you can drop us an email at [email protected] and tell us more about the integration you want to have.

Reply

Josh Corwin

In the ‘All Tasks’ view, it would be very beneficial to be able to see the whole project name associated with each task. Right now all I can see is the first two characters. It would also be beneficial to be able to see the task end date, not just the start date. Is there a way to adjust these things that I’m not aware of?

Reply

T

Did this ever get figured out? I have the same problem.

Reply

vSoft Studio

Hi Josh, Project Studio does not show the project/group full name in the task list at the moment. We are looking at improving the design on this.

Reply

Tom Norford

Hi, loving the software – using it to help us move house! It would be great if there was the option to change the colours of tasks individually to highlight their importance.

Great job, keep it up!

Reply

Porapinz

What is the difference between checklists and milestones of a task?

Reply

Shady Sameh

can i import from MS projects

Reply

joachim

Dear Team of Project Studio’s,

The app is absolutely fantastic. But I do however have some pointers that maybe can be added later on, or maybe you are still working on them. I can’t seem to find a app on my phone to experience a intregrated project management. But this isn’t a huge issue. I would however find the app more awesome if it could be synchronized and integrated with google agenda. This would make my life a whole lot better.

All best,

Joachim

Reply

vsoftstudio

We are working on Project Studio for both mobile phones and web browser. Stay tuned!

Reply

Joseph Persica

Is there a projected date for release of web/iOS app?

Reply

Tom Koer

I work with Premium version; somehow I cannot manage to complete tasks by checking the little box on the left of the task. This is annoying, because even after I close a project after completion, all the underlying task remain in te tasklist. Only possibility apparently is to delete the tasks, but that means that I lose my work history. How can I mark tasks as completed?

Reply

vsoftstudio

Could you please explain more on what happen when you click on the box on the left of the task?

Reply

Tom Koer

Last week when I clicked the box, it all went well. But now, when I click, nothing happens, and tasks stays alive so to speak. Perhaps I am doing something wrong… I also notice thet the first letter of the name of the stage of the project may appear in this same box. Is there a way to delete that?

Reply

Tom Koer

I must say, when I click the box, the stages of the project appear, but I am not able to complete the task.

Reply

vSoft Studio

Hi Tom, if your project has custom stages, you will have to click on the box, then click Done.

[email protected]

I cannot assign a project to a task that was created without a project

Reply

Ton Ton

I would be very happy with a copy function. We have projects with same base of to do’s and don’t like it that we have to put it in by hand all the same task data again.

Reply

vSoft Studio

We do not have this feature yet but we are working on project cloning for future update. Stay tuned!

Reply

David Enrique Tejada Merlos

Ocupo colocar responsables de tarea aunque ellos no estén registrados en la plataforma, es posible hacer esto ?

Reply

Jaime Mir

Why does my app give this prompt when I try to upload documents: ” THIS APP IS UNABLE TO LINK ADDITIONAL USERS BECAUSE IT HAS BEEN FROZEN PENDING REVIEW”

Reply

vSoft Studio

Hi, we have resolved the issue with our Dropbox upload. Please try again.

Reply

Ben Deisenroth

How do I add a project name after I created the project. I thought I was adding to an existing project but created a new on that is labeled “no project”

Reply

Steven

Hi There, – I was wondering if there was a way to add additional stages to the status of a project. I would love to be able to see at a glance at where along the timeline a project’s overall status is sitting, similar to the stages of a particular task within a project

Reply

Steven

When a project is complete, is there a way to archive it?

Reply

vSoft Studio

Hi, we don’t have this feature at the moment, but we think it is a great idea! We will start to work on this soon.

Reply

Jen Martinez

Is this a feature now? as of 6/26/18?

Reply

Andrew Adema

Can we hide old projects?

Reply

vSoft Studio

Hi, we don’t have this feature at the moment, but we think it is a great idea! We will start to work on this soon.

Reply

Tiffany Johnson

I downloaded this app yesterday for my company. Today I get on here and it wont give me access and the app isn’t showing up in the “store” to download onto my other computer. Its not syncing and its saying I dont have any purchases, which I have a receipt for

Reply

vSoft Studio

Hi, does you company restrict apps that you can install in Microsoft Store. Can you try to visit the direct link to the app https://www.microsoft.com/store/apps/9nblggh3st8b?

Reply

BCO

Hi,
Could it be possible to have link between task as if task2 have to start after task1 is finish?
And if a make a modification exemple add 2 days in task1 it will automatically modify task2 final date ?
I thank you in advance

Reply

Graham

Hi

Great product so far. How do I move a task from one Project to another please?

Reply

vSoft Studio

Hi Graham, at the moment Project Studio does not allow moving task between projects. You can try to use export to/import from Excel functions to move large number of tasks between projects.

Reply

Dan Davis

Project Studio seems to have the potential of a useful PM tool. But today, no way. A Gant chart scheduling tool without the ability to link tasks is really useless. Plus the other features your customers have asked for that are not available yet. I don’t understand why developers feel they need to push their partially developed products into the marketplace. As a customer it’s frustrating and doesn’t get my vote of confidence. I’ll check back periodically to see if this thing has grown up and is wearing big boy pants yet. In the mean time I am looking for solutions ready for me to use.

Reply

Jose Mario Dougherty

Let us know what solution you found. I have the same issue.

Reply

Lara McLellan

The sync functionality is not working between my computer and my coworker’s, despite both being connected to internet. Why might this be?

Reply

Allen Carpenter

A Housekeeping problem: I entered a lot of information without assigning it to a project (I forgot to; an easy thing to do) . Is there anyway to transfer “all tasks” into a project without starting from scratch? A tedious proposition!

Reply

Andrew Adema

When a project is completed can it be hidden?

Reply

Andrew Adema

nevermind you already answered this question. thanks

Reply

DavidR

Is it possible to export all projects to excel at the same time, rather than just one at a time?

Reply

vSoft Studio

Hi DavidR, at the moment you cannot export all projects to Excel at the same time. Are you mind letting us know more about why you would need this function?

Reply

Hallie

I’ve been trying to purchase a year premium for about a week now and keep getting an error message. I have tried contacting the support email and never got a response

Reply

Phil Robertson

How do I remove a project? I do not see any option.

Reply

Phil Robertson

I see the answer to this. Thanks.

Reply

DRo

Where is a tutorial? So far the app does not seem very intuitive. I need to learn more on how it works. Example: I created a project in the project list on the far left side of the program. When I click on it it shows 1 task that I have created within that project. I have created 2 tasks and the seoond task is no where to be found. I would think you would create a task and put under that umbrella additional sub tasks, but so far I cannot find the second task.
Thanks
DRo

Reply

Christopher Ebreo

Please add sub task (not the checklist) to the main task so that we could put also some timeline in the sub task. Thank you.

Reply

bayne Porter

I am having trouble syncing tasks – says sync fail. Any suggestions? FYI – my partner and I have been using project studio for about 6 months. so far, syncing has been the only issue.

Reply

Thinh

The app keeps creating new tab link whenever I switch to a new project, no matter It already has or not!.
I have a suggestion that I think the top sidebar should be putting the things belongs to the current choosing project, not for the other things.
Don’t mix them up.

Reply

Matthew W Alvey

Outstanding App. Any updates on mobile application? I have iPHone and iPad, and I would convert to this app if I could access my data on the go!

Reply

Greg Paddick

I have tried loading onto my desktop – Win10 – and I have the Project Studio Icon on my Task Bar but whenever I try to open the App I get the opening screen with the “preparing awesome” message but that is as far as it gets?
I would like to uninstall and reinstall but I think the App hasn’t finished installing so there is nothing yet to Uninstall??

Reply

Steve Balenovic

Can you duplicate projects?

Reply

Chuck M

Is there a way to set dependencies for tasks? Can tasks be linked in any way?

Reply

Kieron Smith

Hi,

Is it possible to move tasks up and down within the list? Even better, is it possible to order the list in terms of start date/end date etc…?

Regards

Reply

Kieron Smith

Never mind…found it within the settings function top right (i.e. sort function for anyone who struggles to find it like I did)

Reply

Fraser Walker

Can I Add Working hours – his does not work if it assumes i work 24 hours a day

Reply

ASC Somno

Attachment in anyway is not working at all.

Reply

Ido

Can I change the working days?

Reply

Alan

How do I get my tasks commencing with the first task starting at the top. Currently when I enter the tasks the more recent one entered is at the top which in my case should be at the bottom as this would be my last task.
Thanks

Reply

MAhmoud

when exporting to excel the dates come out with the hour and minutes is there any option to export the dates only

Reply

Brenda Orozco

Hi,
I’d like to know if I can duplicate an already existing project or do I need to rewrite everything again in a new similar one.
Thanks

Reply

hikmat mahjoub

I want to delete my profile. Please help me do so

Reply

Jen Martinez

6/26/18 Hello. Can I import a checklist from an excel file? Secondly, can I save a checklist as a template? I can’t seem to find any Tutorials on this software. Please advise. Thanks.

Reply

vSoft Studio

We do not have checklist import at the moment, but we are looking at improving the feature.
Would you mind dropping us an email at [email protected] to discuss know more about what you would need for the checklist?

Reply

Sherri Williams

I cannot figure out how to add a project to a task….task is already created….how do i assign to a project?

Reply

vSoft Studio

We are sorry that you cannot move tasks among projects at the moment. You will have to add the task into the project at the creation time.

Reply

Michael Starr

Can I import Tasks from a spreadsheet?

Reply

vSoft Studio

Yes, you can import tasks in a project to Excel file. You can follow the guide in https://projectstudio.online/how-to-import-export-tasks.

Reply

Jenny Wickettt

Any how to videos, walkthroughs or pdfs available on how to best use all its features?

Reply

Raymond W. Polone

I don’t understand how to clone a task and schedule it at later dates?

Reply

Paul

How do I create a milestone?

Reply

Joe Arguedas

I really like your product, and won’t mind paying the yearly fee.
Question: If I create a Task and forget to choose a Project or Group before pressing Save – it automatically goes to a No Project project. BUT – I don’t think I’m able to fix that problem: I go to the Task and there’s no way to Edit it and add /choose a Project or Group.

Please assist.

Reply

Alex Tadeu A Soares

Why milestone has a start and end date? I´m used to use milestone as final date, could you please explain what you think about milestone? Thank you very much, i like project studio.

Reply

Li

请问还有多久才会推出手机版和Mac版的Project Studio?

Reply

Ricardo Basilio

Hello,

how do i search for tags?

Thanks

Reply

Michael Cooper

Can I print any reports

Reply

riccardo di maria

how do I sync Projects Calendar with Outlook calendar ?

Reply

Thant Sin Lin

Will there be dark theme in the future? Current UI is great but white background really makes my eye tired.

Reply

Roger

How do I make a sub-task?

Reply

Tatiana

Hi! How I can add every Day task with every Day reminder? Without clone.

Reply

Jeff Dillon

Do you have a “direct” download for projectstudio? My corporate IT department blocks the Windows store.

Reply

Keeith

emm i dont find a button to start a task on timeline QAAAQ
and for HOUR/DAY, how to just display a complete 24h/7days, before scaling +-
thank you !!

Reply

Sang Pil Lee

Hello,

I am user of Project studio app.
I feel to need more good option on “group” function on your app.
Sometimes I want to separate/divide from one group into two group.
Example as below
Group: A team, B team , C team, D step, E step, F step, G step
=> Group I: A, B, C, D (team),
=> Group II: E, F, G (step)

Could I do it ?

Thanks,

Reply

Sang Pil Lee

Hello,

I am user of Project studio app.
I feel to need more good option on “group” function on your app.
Sometimes I want to separate/divide from one group into two group.
Example as below
Group: A team, B team , C team, D step, E step, F step, G step
=> Group I: A, B, C, D (team),
=> Group II: E, F, G (step)

Could I do it ?

Thanks,

Reply

Laura

Can you assign a due date to a sub-task?

Reply

paul bruggeman

How can I set a work week? or The hours that a user is working during a day? Now vSodt Studio is assuming that people are working 24 hours a day and 7 days a week

Reply

paul bruggeman

How can I set a work week? or The hours that a user is working during a day? Now vSodt Studio is assuming that people are working 24 hours a day and 7 days a week.

Reply

Jose Mario Dougherty

Is there a way to link tasks, as to complete one task before the other one starts. Thinking on a Gannt tracking system for a project to develop.

Reply

Christal Azzam

Hello,

If we were to buy the Premium version of this software, how many team members can have access to the software?

Reply

Mike Davidson

How do I get a Project Studio Users Manual? How do I see the unfinished task list?

Reply

Selby Manakaza

Nice tool for accurate management. But how do I delete a project, I’ve been trying?

Reply

Stephanie Maxwell

Is there a way to setup recurring tasks – i.e. monthly meeting preparation. Thanks!

Reply

Zoltan Racz

Hello, please add 24 hour time format and custom country date formats. Do you want integrate Project Studio with Google Calendar? Thanks

Reply

Greg Malone

How do you get rid of or rename the “No Projects” project? Fail.

Reply

Jesse Gurule

Will you have an option to input % of completion by task? Do you have an idea when the print option will be available or email? The exel download function is not working on my computer.

Reply

Ramon Garcia

Hi.

Can I create sub tasks to a task?

Reply

Larry Newton

Where does my data reside?

Reply

Larry Newton

You answWered this – so ignore this. BUT will this tool get orphaned? Then what? Are you still developing this?

Reply

Deirdre Doyle

Is there a way to add expenses?

Reply

Erhan Ekinci

Can I set start of week from Sunday to Monday?

Reply

hasan bahrami

hi there
plz add this 2 option to the app
1- custom reminder for repeating tasks
2- subtasks(time and reminder setting) cheklist

Reply

Paula Johnson

I am not getting the confirmation email to finish setting up my account. I have checked spam, promotions, etc and I have nothing.

Reply

Richard Rüegger

Hi when I try to export the File into Excel with milestones as a Chart it only imports the tasks. Is there a way?

Kind regards

Reply

collin.knarren

Is it possible to export the whole timeline with all tasks of different projects into Excel ?

Reply

Collin Knarren

Is there a way to copy a whole project like a template ?

Reply

Cat Knight

Hi, how do I archive a project when it’s finished?

Reply

zhang yasi

Hi , can I create a gantt chart using project studio?

Reply

HardWired

I second this question.
Gantt is the main reason I downloaded this software, but I do not see the option to define dependencies.

Reply

Lydia Desnoyers

any reply to this yet?

Reply

Aaron Emmanuel

Hey there, great app so far! I would love to be able to sync the milestones/tasks to a calendar app. It would really help to visualize the timeline. Are you all working towards being able to integrate in that way?

Reply

Collin Knarren

Is there a possibility to export the whole overview of all projects in Excel ?

Reply

Collin Knarren

Is there a possibility to copy projects with all tasks in Project Studio so I can use my own template time and time again ?

Reply

Collin Knarren

Is there a connection with outlook ? When there are due times etc. we would get a reminder in our email ?

Reply

Taoxi Ding

I need the function of SubTask , When will it implemented? Thanks.

Reply

grisanasena

Can I change the task list to view by top down list for oldest to newest task?

Reply

Tim Holmes

When I export tasks to excel with the check lists enabled, I only get 1 item from the check list…
Being able to export or directly print these checklists is a big deal.

Reply

Keith Harrison

Hi, I was wondering, is it possible to move a task from one project to another?
Thanks,
Keith

Reply

Tracker Fire

Is it possible to accept invitations to projects from within the app or do I have to accept the invitation to join a project from the email only? I would like to accept the invitations from within the application.

Reply

Rusan

Hi, I seems cant subscribe to premium version for users outside US. Can help?

Reply

Mario Weber

475/5000
Hi team,

I like Project Studio.:
I have two concerns:
a. It would be perfect if the e-mail feature were available.
b. it would be better if the “task stages” (to do, pending, ect.) could be displayed in different colors.
If you could do that, “Project Studio” would be a little bit better.

Thank U
Mario

Reply

wyz23x2

+1. Agree.

Reply

Lydia Desnoyers

did you ever get a response to this? I think this would be very helpful

Reply

Debbie Luna Zapata

How can I get a member to be able to view the projects I have created? I sent them a invitation however it is not syncing with my project

Reply

jean touboul

Sent an email with a few question to support but may as well try the same here since we are testing and plan to expand if it make sense and have several people use for various projects

1) Sent an invite but it was not delivered? I thought that two people could be part of FREE
2) Can we combine two Projects or copy tasks from one to another?
3) How exactly is this COUPON system working? Does 3 coupons means that 3 people can have your system on their devices or allow for the setup to be on a maximum or 3 devices?
4) Can we create a template that would include tasks and that can be used for same processes
Is there a way to organize Projects into “higher leve” folders or category. For instance an OPS Category that would contain all the Operations related Project and a DEV category that would regroup all the Development related projects?

Looking forward to hear from you.

Regards,

JT

Reply

LaCarl S

Can I duplicate or replicate a project from a prior one I created?

Reply

Jennifer Stutz

Can tasks be made to be dependent on another task?

Reply

Leonardo Belmares

Can I Add Working hours – his does not work if it assumes i work 24 hours a day 7 days peer week

Reply

Matias

How to set up preceding tasks?

Reply

Michael Zwicker

are you also working on a German translation?

Reply

Heidi Vainio

When I want to see completed tasks, there isn’t any. What happens to the tasks I’ve checked?

Reply

DONALD KNIGHT

WHEN I GO BACK TO SEE MY COMPLETED TASKS THEY ARE NOT THERE. I REALLY NEEDED THIS TO WORK AND IT DID’NT. VERY DISAPPOINTED

Reply

ONAI BAUDI

hello i just completed a project in project studio but it will not export to excel it os redirecting me to the windows app store and this is becoming very frustrating. How can I fix this??plz reply asap

Reply

Lydia Desnoyers

can we change the colors on the gantt chart to easily identify the stages of tasks? For example, blue for not started, yellow for in-progress, etc.?

Reply

Brian Mugo

What is function of a tag?

Reply

Ernesto Garcia

Do you have a tutorial of this app? Any youtube videos? I looked at your webpages and found nothing.

Regards,

Er

Reply

Rossana Vicentelo

como se puede cambiar el idioma a español?

Reply

Amin suedan

como cambio el idioma a español?

Reply

Alper

While I added a new member to a project, app shows me the user is in pending status but there is no email sent to member.

Reply

Alper

I mean I cannot add a new member to a project.

Reply

Jacob Kirk

Can task be linked, like start dates and end dates, so when one task changes the linked task changes as well?

Reply

Karry Bird Kim

how do you discussion?

Reply

Linda Bassett

Can I reorder tasks in a list?

Reply

Dovydas Packauskas

Is there a possibility to see full/partial project name and not the abbreviation in All Tasks Timeline?

Reply

Philippe Ceyrat

Hello,
Is it possible to declare wich is (are) the task(s) predecessor(s) to a task or to declare depencies between tasks.
Thanks in advance for your answers
Regards

Reply

Belinda Chen

Is there a setting when I create a new task to assign it to repeat every week or month going forward so I won’t have to copy it for each week/month?

Reply

Franco

I want the same option.

Reply

Emanuel Zuluaga

I would like to know if this app still being supported and updated?
It seems like this app was abandoned… I was really considering in buy the premium version.

Reply

Emanuel Zuluaga

I would like to know if this app still being supported and updated?
It seems like this app was abandoned… I was really considering in buy the premium version.
26/06/21

Reply

Casey

For the duration for my task can I sent my work week instead of it counting every single day?

Reply

Casey

For the duration for my task can I sent my work week instead of it counting every single day?

Reply

Otto Pichler

Is there a function for tasks which has to be performed every month or week on a certain day?

Reply

Rory McLoughlin

how do I change the nasme of the project?

Reply

Rory McLoughlin

how do I change the name of the project?

Reply

Michelle Van Mill

Hello, I am trying to locate your terms or End User License Agreement (EULA) for using the Basic Free account but have been unable to locate them on your website. Can you provide so I can review them?

Reply

Freddie

what happened to my 2021 completed task? where can i find it?

Reply

Lu Longchang

how can I remove the weekend(Saturday & Sunday)?

Reply

donguk

From a few weeks ago, sign in is keep failing.
Is there any issue?

Reply

B Holladay

How do i delete?

Reply

Nicholas Burton-Howat

can I link Project Studio with my Outlook account or Teams?

Reply

Da-ding

Hi,
Can I just list the current path rather than all steps on the title bar?
Is it possible to support the rearrangement of checklist and the reuse of tags?

Reply

Missed Opportunity

I love how I can see the exact moment this project was abandoned. what a shame

Reply